Location
Endako Mine – Centerra Gold Inc.
Project Description
The work consisted of:
- Loading, hauling, dumping, decking and levelling 200,000 metric tonnes of stockpiled PAG material to lower Denak Pit area as part of the mine’s reclamation program
- 2,800 tonne / day average production