Back To Category

PAG Pile Removal

Location
Endako Mine – Centerra Gold Inc.

Project Description

The work consisted of:

  • Loading, hauling, dumping, decking and levelling 200,000 metric tonnes of stockpiled PAG material to lower Denak Pit area as part of the mine’s reclamation program
  • 2,800 tonne / day average production