Waste Water Lagoon Expansion

Location
Village of Fraser Lake, BC

Project Description

The project involved the construction of a new sewage lagoon. The work included:

  • Design, supply and install site environmental control measures
  • Clear and grub approx. 2.5 Ha
  • Excavate and haul waste off-site approx. 12,000m³
  • Construct berms and import approx. 10,000m³ of borrowed material
  • Supply and install approx. 300m of 25mm water service
  • Supply and install approx. 171m of 50mm HDPE sanitary sewer force main
  • Supply and place approx. 500m of perimeter fencing
  • Hydro-seed approximately 3 Ha